During my career acquired skills of cooperation with people, responsibility and planning of performing work. I'm the sociable, hardworking and responsible person.
Tower preparation for cable pulling. Cable Pull Team (Pulling CPS, pulling cables). Pulling with DROMEC winch. CTV transfer. Walk to work system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Cable replacement project. Loading cable. Removing old cables. Pulling and laying new cables. All other activities as a member of CLV.
Loading cables into a carousel. Barge mobilization .All activities as a cable laying deck team.
Vessel mobilization. Loading cable. Preparation shore area. Cable pulling ashore. Permit to work system.
Tower preparation for cable pulling. Cable Pull Team (Pulling CPS, pulling cables).Working with Punch list. CTV transfer. Walk to work system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Loading pin pails on the vessel. Offloading pin pails on Jack-up. Other lifting operations
(containers, spare parts). Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Assembly parts ( monopile with external platform and boatlnding) .Lifting operations. Bolting by PLARAD tension system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Loading pin pails on the vessel. Offloading pin pails on Jack-up. Other lifting operations
(containers, spare parts). Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Assistance with ICCP cold/hot commissioning works, connection and testing. Secondary mechanical works. Lifting operations. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Internal and external platforms installation. Bolting. Grouting assistance. CTV transfer. Lifting operations.
Assistance with maintenance and repairing of trencher (Deep Dig-IT). Refueling operations. Lifting operations. Rigging equipment inspection, job analyzing , permit to work system
Monopiles installation. Installation TP. Bolting by ITH – bolting tensioning equipment. Working with hydraulic system. Lifting operations. Rigging equipment inspection.
Tower preparation for cable pulling. Cable Pull Team (Pulling out cable from tower and pulling new cable to tower). Cable Stripping Team (incl. hangoff installation). Routing cables .CTV transfer. Walk to work system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.
Cable termination team, fiber optic cables installation assistance. Cable Stripping team. Rigging equipment inspection, health & safety working system, job analysing, permit to work system.
Onshore work. Unloading and assembling CPS. Cargo preparation. Lifting prepared cargo from site to CTV by 360° telescopic handler. Maintenance and service. Rigging equipment inspection, health & safety working system, job analysing, permit to work system.
Fiber Optic Cable Pull Team. Cable Stripping team (incl. hangoff installation). Walk to work system. CTV transfer. Rigging equipment inspection, health & safety working system, job analysing, permit to work system.
TP preparation. Foundation, Installation, bolting by ITH-bolting tensioning equipment. Assistance with grouting (taking samples) Lifting operations. Rigging equipment inspection, health & safety working system, job analysing, permit to work system