Summary
Overview
Work History
Education
Certification
Timeline
Generic

Valerij Vasiliuk

Offshore Rigger/Technician
Klaipeda

Summary

During my career acquired skills of cooperation with people, responsibility and planning of performing work. I'm the sociable, hardworking and responsible person.

Overview

6
6
years of professional experience
5
5
years of post-secondary education
16
16
Certifications
2
2
Languages

Work History

Gode Wind 03

Boskalis
02.2024 - 03.2024

Tower preparation for cable pulling. Cable Pull Team (Pulling CPS, pulling cables). Pulling with DROMEC winch. CTV transfer. Walk to work system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Luchterduinen Project

ECE Offshore
08.2023 - 10.2023

Cable replacement project. Loading cable. Removing old cables. Pulling and laying new cables. All other activities as a member of CLV.

Blauw Project

ECE Offshore
02.2023 - 06.2023

Loading cables into a carousel. Barge mobilization .All activities as a cable laying deck team.

Red Sea Project

ECE Offshore
09.2022 - 12.2022

Vessel mobilization. Loading cable. Preparation shore area. Cable pulling ashore. Permit to work system.

Saint Nazaire Project

Louis Dreyfus Travocean
03.2022 - 09.2022

Tower preparation for cable pulling. Cable Pull Team (Pulling CPS, pulling cables).Working with Punch list. CTV transfer. Walk to work system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Saint Brieuc Project

Van Oord
06.2021 - 11.2021

Loading pin pails on the vessel. Offloading pin pails on Jack-up. Other lifting operations

(containers, spare parts). Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Taranto Project (Mock-up)

Van Oord
05.2021 - 05.2021

Assembly parts ( monopile with external platform and boatlnding) .Lifting operations. Bolting by PLARAD tension system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Saint Brieuc

Van Oord
04.2021 - 05.2021

Loading pin pails on the vessel. Offloading pin pails on Jack-up. Other lifting operations

(containers, spare parts). Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Borselle Project

Van Oord
02.2021 - 03.2021

Assistance with ICCP cold/hot commissioning works, connection and testing. Secondary mechanical works. Lifting operations. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Fryslan Project

Van Oord
10.2020 - 12.2020

Internal and external platforms installation. Bolting. Grouting assistance. CTV transfer. Lifting operations.

HKZ Project

Van Oord
07.2020 - 09.2020

Assistance with maintenance and repairing of trencher (Deep Dig-IT). Refueling operations. Lifting operations. Rigging equipment inspection, job analyzing , permit to work system

Danish Kriegers Flak Project

Van Oord
04.2020 - 06.2020

Monopiles installation. Installation TP. Bolting by ITH – bolting tensioning equipment. Working with hydraulic system. Lifting operations. Rigging equipment inspection.

Norther

Van Ooord
11.2019 - 01.2020

Tower preparation for cable pulling. Cable Pull Team (Pulling out cable from tower and pulling new cable to tower). Cable Stripping Team (incl. hangoff installation). Routing cables .CTV transfer. Walk to work system. Rigging equipment inspection, health & safety working system, job analyzing , permit to work system.

Deutche Bucht

Van Oord
05.2019 - 08.2019

Cable termination team, fiber optic cables installation assistance. Cable Stripping team. Rigging equipment inspection, health & safety working system, job analysing, permit to work system.

Deutche Bucht Project

Van Oord
04.2019 - 05.2019

Onshore work. Unloading and assembling CPS. Cargo preparation. Lifting prepared cargo from site to CTV by 360° telescopic handler. Maintenance and service. Rigging equipment inspection, health & safety working system, job analysing, permit to work system.

Norther Project

Van Oord
01.2019 - 03.2019

Fiber Optic Cable Pull Team. Cable Stripping team (incl. hangoff installation). Walk to work system. CTV transfer. Rigging equipment inspection, health & safety working system, job analysing, permit to work system.

Deutche Bucht Project

Van Oord
09.2018 - 01.2019

TP preparation. Foundation, Installation, bolting by ITH-bolting tensioning equipment. Assistance with grouting (taking samples) Lifting operations. Rigging equipment inspection, health & safety working system, job analysing, permit to work system

Education

Bachelor of Science - Metalworks Machine Technology

GrNU
09.2013 - 05.2018

Certification

• Winda ID: VV731865LT

Timeline

Gode Wind 03

Boskalis
02.2024 - 03.2024

Luchterduinen Project

ECE Offshore
08.2023 - 10.2023

Blauw Project

ECE Offshore
02.2023 - 06.2023

Red Sea Project

ECE Offshore
09.2022 - 12.2022

Saint Nazaire Project

Louis Dreyfus Travocean
03.2022 - 09.2022

Saint Brieuc Project

Van Oord
06.2021 - 11.2021

Taranto Project (Mock-up)

Van Oord
05.2021 - 05.2021

Saint Brieuc

Van Oord
04.2021 - 05.2021

Borselle Project

Van Oord
02.2021 - 03.2021

Fryslan Project

Van Oord
10.2020 - 12.2020

HKZ Project

Van Oord
07.2020 - 09.2020

Danish Kriegers Flak Project

Van Oord
04.2020 - 06.2020

Norther

Van Ooord
11.2019 - 01.2020

Deutche Bucht

Van Oord
05.2019 - 08.2019

Deutche Bucht Project

Van Oord
04.2019 - 05.2019

Norther Project

Van Oord
01.2019 - 03.2019

Deutche Bucht Project

Van Oord
09.2018 - 01.2019

Bachelor of Science - Metalworks Machine Technology

GrNU
09.2013 - 05.2018
Valerij VasiliukOffshore Rigger/Technician